Design of Prestressed Assembly Foundation for Communication Single Pipe Tower
In order to prefabricate and assemble the independent foundation of the communication single pipe tower based on the principle of fast construction and reuse,this paper proposes a prestressed assembly foundation,which solves the requirements of construction units for fast,safe,and simple station construction,and is easy to relocate and can be reused.After the pouring and curing of each component in the factory are qualified,they are transported to the site and lifted and installed according to the corresponding situation of the embedded parts of each component.The installation of the base station foundation can be completed in 3 hours.This type of base station truly achieves fast and safe on-site installation,and does not require high technical requirements from on-site construction personnel,so its practicality is extremely high.Meanwhile,as the foundation is prefabricated within the factory,the quality is more guaranteed.Especially if this base station is facing relocation,the foundation can be quickly removed after the iron tower is removed and transported to another location for installation,which can be reused and has great promotional value.
iron tower foundationindependent foundationfoundation design