Study on Construction Technology of New-type Low-side Wall Formwork in Comprehensive Pipe Corridor
In view of the shortcomings of the low-side wall in the comprehensive pipe corridor,such as the poor molding effect and the different thickness of the reinforcement protective layer after the concrete casting,this paper introduces a new type of low-side wall formwork which installs the locating square steel on the vertical part,and expounds the construction technology of new-type low-side wall formwork in detail.The new-type low-side wall formwork can be constructed conveniently and safely,meet the standard requirements,save the project cost during the construction process,avoid producing waste residue and dust,and reduce the construction waste,aiming to provide a feasible new-type low-side wall construction program for other similar projects in China.
comprehensive pipe corridorlow side wallformworkconstruction technology