城市建筑废弃物处置结合生态修复项目实施可行性研究
Feasibility Study on Implementation of Urban Construction Waste Disposal Combined with Ecological Restoration Project
吴静 1郭鹏 2齐光文 1罗霄 1何龙斌1
作者信息
- 1. 深圳市建筑科学研究院股份有限公司,深圳 518049
- 2. 深圳市建研检测有限公司, 深圳 518117
- 折叠
摘要
本文通过研究深圳市不同类别的生态修复工程结合建筑废弃物处置的案例情况,从源头减排、综合利用、消纳填埋三方面切实了解建筑废弃物处置结合的可行性,总结出生态修复项目处置建筑废弃物的措施并提出具体的实施建议.以此拓宽建筑废弃物处置渠道,提升建筑废弃物处置水平,降低"垃圾围城"的城市风险.
Abstract
The paper by case studies on different types of ecological restoration projects combined with construction waste disposal in Shenzhen,the feasibility of ecological restoration projects combined with construction waste disposal is truly understood from three aspects:source emission reduction,comprehensive utilization,and landfill.Measures for the construction waste disposal in ecological restoration projects are summarized,and specific implementation suggestions are proposed,so as to broaden the channels for the disposal of construction waste,improve the level of construction waste disposal,and reduce the urban risk of"garbage siege".
关键词
建筑废弃物/建筑废弃物处置/生态修复工程/深圳/实施Key words
construction waste/construction waste disposal/ecological restoration engineering/Shenzhen/implementation引用本文复制引用
出版年
2024