In order to ensure that the surface settlement value of offshore water-rich sand layer excavation does not exceed the allowable value of housing construction within the influence range,this paper compares and analyzes the excavation,support,and precipitation plans through modeling and simulation calculations,combining calculated data with actual measurements.It proposes a monitoring and measurement method for excavation of foundation pits in water-rich sand layers near buildings,increasing the mud density for wall protection,multiple water blocking and waterproofing measures,and precipitation measures.The technical difficulties encountered during construction have been successfully solved,with the aim of providing experience and reference for similar projects.
关键词
富水砂层/地连墙/监控量测/数字分析/近海
Key words
water rich sand layer/diaphragm wall/monitoring measurement/digital analysis/offshore