模块化建筑机电管线快速安装研究

Research on Rapid Installation of Modular Building Electromechanical Pipelines

扫码查看
模块化建筑作为一种新兴的建造方式,通过数字技术、工厂制造的助力,可实现工厂、施工现场的平行施工,极大地减少现场施工内容,降低施工总工期.随着多个模块化建筑项目的实施,其涉及的机电管线在工厂内的安装预留、以及机电管线在现场的快速接驳施工已成为影响模块化建筑施工进度、质量的重点与难点.本文以北京亦庄N20蓝领公寓项目为例,针对这些重点难点在项目施工过程中的解决方案进行归纳总结,同时开展进一步的分析和研究.
As an emerging construction method,modular building can realize the parallel construction of the factory and the construction site through the help of digital technology and factory manufacturing,greatly reducing the on-site construction content and reducing the total construction period.With the implementation of a number of modular building projects,the installation and reservation of the electromechanical pipelines involved in the factory,as well as the rapid connection construction of the electromechanical pipelines on the site,have become the key and difficult points affecting the construction progress and quality of modular buildings.Taking the N20 blue-collar apartment project in Yizhuang,Beijing as an example,this paper summarizes the solutions of these key difficulties in the construction process of the project,and carries out further analysis and research..

modular buildingelectromechanical pipelinesrapid installation

侯鸿杰、刘宁、张雷、张平平、任俊超

展开 >

中建集成科技有限公司,北京 100195

北京经济技术开发区土地储备与建设服务中心,100176

模块化建筑 机电管线 快速安装

2024

建设科技
住房和城乡建设部科技发展促进中心

建设科技

影响因子:0.6
ISSN:1671-3915
年,卷(期):2024.(24)