Architect Responsibility System+EPC Model to Achieve High Quality and Rapid Construction of"Dual Use"Project for Both Normal and Emergency Operations——Taking Pinggezhuang Village,Liulihe Town,Fangshan District as an example of the normal and emergency use
During the critical period of epidemic prevention and control transition in 2022,the Beijing Municipal Government actively responded to the national call and vigorously promoted the construction of centralized isolation points for epidemic prevention and control.As a key construction project in Fangshan District,the Pinggezhuang Village collective rental housing(centralized medical observation point)and dual-purpose for normal and emergency use project in Liulihe Town aims to create a medical observation point that meets both permanent building standards and flexible conversion.The project is time sensitive and requires rapid completion of design and construction,while also meeting the high standards and special requirements of emergency projects.In this context,the combination of architect responsibility system and EPC model is particularly important.This article takes this project as an example to explore the combination of architect responsibility system and EPC work model,and analyze its application and practice in the"dual-purpose for normal and emergency use"project.At the same time,it explores the innovative application of prefabricated buildings and integrated modules in this project.
architect responsibility systemEPC modeldual-purpose for normal and emergency useepidemic situation