In the construction of prefabricated buildings,electrical pipeline reservations need to be reserved for both walls and ceilings,while positioning and laying of PC composite panels need to be considered on the cast-in-place layer.The construction of electrical pipeline laying in PC composite panels of prefabricated buildings has its particularity.The elevation position of the e truss reinforcement in the prefabricated building PC composite panel restricts the way,space,and routing of electrical pipeline laying,which changes the laying method of electrical pipelines from"placing"to"threading".In order to meet the specifications for the thickness of the protective layer of electrical pipelines,the bending radius of pipelines,and also to meet the requirements for the use of points in fine decoration,this paper discusses the optimization of pipelines and points in PC composite panels,and explores the pipeline laying of circuits on PC composite panels.
关键词
PC叠合板/管线铺设/板面厚度/点位深化设计
Key words
PC composite panel/pipeline laying/board thickness/deepening design of points