给水排水2024,Vol.50Issue(1) :103-107.DOI:10.13789/j.cnki.wwe1964.2022.07.07.0010

消毒化粪一体池研究与应用

Research on disinfection and septic integrated tank

丁晓珏 孙立宇 齐小依 鄢胜勇 张颖
给水排水2024,Vol.50Issue(1) :103-107.DOI:10.13789/j.cnki.wwe1964.2022.07.07.0010

消毒化粪一体池研究与应用

Research on disinfection and septic integrated tank

丁晓珏 1孙立宇 2齐小依 1鄢胜勇 1张颖1
扫码查看

作者信息

  • 1. 中国中元国际工程有限公司,北京 100089
  • 2. 华商国际工程有限公司,北京 100069
  • 折叠

摘要

随着"新冠类"疫情爆发,需要有运行可靠的预消毒设施以阻止病毒的繁殖和传播,设置消毒化粪一体池,可以解决淤堵隐患,保证消毒效果.该一体池采用二级投加消毒剂的方式,为实际工程提供切实可行的预消毒构筑物,满足不同时期污水初期处理要求;同时提出了消除余氯对后期污水处理影响的措施并给出36 h停留时间后建议的出水的余氯量.

Abstract

With the outbreak of the"new coronavirus",it is necessary to have reliable pre-disin-fection facilities to prevent the reproduction and spread of the virus,and the setting of disinfection and feces integrated pool can solve the hidden danger of blockage and ensure the disinfection effect.The integrated pool uses the method of two-stage adding disinfectant to provide feasible pre-disin-fection structures for practical projects and meet the requirements of initial treatment of sewage in different periods.At the same time,the measures to eliminate the influence of residual chlorine on the late sewage treatment are put forward,and the suggested residual chlorine amount of effluent after the residence time of 36 hours is given.

关键词

预消毒/消毒化粪一体池/二级投加/余氯影响/脱氯措施

Key words

Advance disinfection/Sterilized feces integrated pool/Secondary dosing/Impact of residual chlorine/Dechlorination measures

引用本文复制引用

出版年

2024
给水排水
亚太建设科技信息研究院,中国建筑设计研究院,中国土木工程学会

给水排水

CSTPCDCSCD北大核心
影响因子:0.8
ISSN:1002-8471
参考文献量8
段落导航相关论文