给水排水2024,Vol.50Issue(1) :121-128.DOI:10.13789/j.cnki.wwe1964.2023.02.03.0003

基于水力模型的污水管网高水位运行问题对策研究

Study on high water level operation's solution for wastewater drainage system based on hydraulic model

颜莹莹 陈凤梅 李强 刘正彪 陈翔 刘煜 陈亮
给水排水2024,Vol.50Issue(1) :121-128.DOI:10.13789/j.cnki.wwe1964.2023.02.03.0003

基于水力模型的污水管网高水位运行问题对策研究

Study on high water level operation's solution for wastewater drainage system based on hydraulic model

颜莹莹 1陈凤梅 2李强 1刘正彪 3陈翔 1刘煜 2陈亮3
扫码查看

作者信息

  • 1. 长江生态环保集团有限公司,武汉 430077;六安市三峡智慧水管家有限责任公司,六安 237000
  • 2. 长江生态环保集团有限公司,武汉 430077
  • 3. 三峡智慧水务科技有限公司,上海 200000
  • 折叠

摘要

管网高水位运行严重影响着水质净化厂运行效率和水环境安全.以六安市城北片区污水系统为例,由于存在用水早晚高峰的情况,区域内泵排区和自流区高峰水量叠加,造成水质净化厂进水泵房及相关管网全天大部分时间处于高水位运行情况.基于数值模型技术,通过分析泵站片区可调蓄水量和需要调蓄的水量,对二级污水泵站设置时序控制规则,利用多方案寻优方法,判断最优方案.最优方案通过PLC对各泵站进行实际设置,基于实际运行效果,发现利用时序控制方法可以有效降低管网高水位运行情况,并且增强了进水稳定性,保证水质净化厂稳定运行.

Abstract

High water level of drainage system affects the operation efficiency of Waste Water Treatment Plant(WWTP)and endanger the safety of water environment.Focus on sewage system of Chengbei District in Luan city,the pump inlet room and related pipelines remained high water level in most of the day because of peak time for water user.Based on numerical model,time series of control rules was set for the secondary sewage pumping station by analyzing adjustable storage volumes and volumes which were needed to be adjusted.Multiple solution schemes were proposed and the best solution was chosen.The control rules for best solution was set for each pump by PLC.The result showed that time series of control rules could efficiently reduce high level opera-tion in drainage system,and enhanced the stability of inflow which could ensure the stable opera-tion of WWTP.

关键词

高水位/水力模型/方案寻优/时序控制

Key words

High water level/Hydraulic model/Solution optimization/Time series control

引用本文复制引用

基金项目

国家重点研发计划(2022YFC3203204)

上海勘测设计研究院有限公司科标业项目(2021QT8-008)

出版年

2024
给水排水
亚太建设科技信息研究院,中国建筑设计研究院,中国土木工程学会

给水排水

CSTPCD北大核心
影响因子:0.8
ISSN:1002-8471
参考文献量6
段落导航相关论文