摘要

根据无锡市某乡镇污水处理厂的新增处理能力需求,设计新建了处理量为2万m3/d的污水处理系统.针对进水波动、工业水混入、高排放标准和场地限制等客观影响因素,开展了以一体化AAO/A-MBR为主体的处理工艺系统工程设计和应用.项目建成运行后,进行了 6个月跟踪监测,出水水质稳定达到排放标准.

Abstract

A new sewage treatment system with a processing capacity of 2.0 × 104m/d has been designed and constructed based on the new processing capacity requirements of a township wastewater treatment plant in Wuxi city.The treatment process system engineering design and ap-plication with integrated AAO/A-MBR as the main body was carried out to address objective fac-tors such as high variation coefficient,industrial water mixing,high discharge standards,and site limitations.After the project was completed and put into operation,it was tracked and monitored for 6 months,and the effluent quality remained stable and met the discharge standards.

关键词

乡镇污水处理厂/AAO/A-MBR/设计/应用

Key words

Township WWTP/AAO/A-MBR/Design/Application