Construction technology of large raft reinforced steel integral support
Post pouring strip construction is often an important node in quality control.This article introduces an adjustable,re-usable,and easily removable adjustable steel pipe sand bucket support system.By optimizing the position of the post-pouring strip to be less than 1 500 mm from the edge of the column,an adjustable temporary steel pipe sand bucket support is set on the other side of the post-pouring strip to replace some scaffolding support.When the beam and slab concrete reaches a certain strength,Ex-cess scaffolding support and formwork can be removed first,and only adjustable temporary steel pipe sand bucket support can be re-tained.This can solve the problem of excessive construction time for large area formwork,timber,steel pipes,etc.,improve material turnover utilization,and achieve good economic and social benefits.Based on the actual situation of the physical project,the con-struction technology principle,process flow,construction points,and quality control measures of the single-side adjustable steel pipe sand bucket support post-pouring belt system are studied,providing practical experience for similar projects to reference.