In the construction of the Shenzhen-Zhongshan Link,a temporary anchorage system,distributed uniformly along the pipe wall,has been employed.To assess the safety and reliability of this system,a combined method utilizing numerical analysis and model ex-periments was applied to study the safety of the temporary anchorage system and the reliability of the tension rods.Firstly,an overall model of the caisson segment based on GINA rebound force was established to analyze the stress state of the entire system.Sec-ondly,a comprehensive numerical analysis and model experiment verification were con-ducted for the single tensioning system,revealing its failure mode and safety margin.The results indicate that the tension rod systems are uniformly stressed at an average of 444 kN during underwater jointing,with a safety factor of 1.94.At this point,the maximum von Mises stresses appearing at the front plate corners and the lower edge of the U-groove,with stress values of 181.8 MPa and 172.4 MPa,and safety factors of 1.54 and 1.71,respectively.When the tension rod force reaches 940 kN,the tensioning system reaches its bearing limit,with initial yielding occurring at the front plate comers.Model experiments were con-ducted to verify the theoretical analysis results,under a test load of 444 kN,the stresses at the front plate corners and the lower edge of the U-groove were 159.6 and 195.9 MPa,respectively.As the test load increased to 940 kN,these stresses reached 390 and 389 MPa,exhibiting good agreement with the numerical analysis.Considering the uncertainty of loads and materials,a reliability analysis of the tension rods was conducted,yielding a reliability index of 4.34,meeting the secondary safety standard.Based on the comprehensive analysis,it can be concluded that the temporary anchorage system in the caisson segments of the Shenzhen-Zhongshan Link exhibits excellent safety margins.

Tunnel engineeringImmersed tube structureAnchorage systemFull-scale model testLoad bearing performanceSafety assessment

Lei Yan、Jinning Yan、Guoping Xu、Shuanhai He、Zechen Zhang

展开 >

School of Highway,Chang'an University,Xi'an 710064,China

Key Laboratory of Transport Industry of Bridge Detection Reinforcement Technology(Chang,an University),Xi,an 710064,China

CCCC Highway Consultants Co.,Ltd.,Beijing 100088,China

National Key Research and Development Program of China

2021YFB1600300

2024

交通运输工程学报(英文版)

交通运输工程学报(英文版)

CSTPCD
ISSN:2095-7564
年,卷(期):2024.11(4)
  • 9