Shanghai Municipal Railway Advanced Repair Vehicle Base Site Selection Planning
Based on the planning achievements of the existing rail transit network in Shanghai,the experience of the senior repair site were summarized through the case study of national rail,municipal railway,and subway advanced repair vehicle bases.The principle and research strategy for selecting the location of the advanced repair vehicles bases for Shanghai municipal railway were presented,and the feasibility of site selection and landing of Shanghai municipal railway advanced repair vehicle bases was analyzed in conjunction with the conditions for ground use,construction timing,link line conditions,and other variables.In order to better ensure the operation of the city's urban railway and promote the development of related industries,it is suggested that the site selection and implementation of the advanced repair function should be carried out within the city,from the perspective of intensive land conservation,the principle of advanced repair function should be combined with the line parking lot,and the comprehensive development and utilization of the superstructure should be considered if the site is located within the urban development boundary.The research ideas and site selection scheme analysis in this paper can provide some reference for the site selection of advanced urban railway in Shanghai.
Municipal railwaysAdvanced repairsSite selection principlesResearch strategySite planning