隧道L型斜井施工期通风系统配置优化

扫码查看
针对隧道L型斜井的施工期通风问题,以某隧道为依托工程,采用数值模拟软件对L型斜井隧道进行模拟,分析不同风机组合下的通风效果,并对L型斜井进行通风优化.研究结果表明,施工期通风系统初选需风量为3491m3/min,风压为5230Pa,考虑到斜井线型为L型,对三种满足初选要求的方案进行比选,模拟发现 2×160kw风机的通风效果较好,但出口断面处CO的平均浓度为4.072×10-5m3/min,仍不符合规范.在此基础上进行优化,在转角处设置 1台75kw的局扇,优化后出口断面CO的平均浓度为3.25×10-12kg/m3,满足规范要求,建议该工程选用2×160kw(风机)+1×75kw(局扇)通风方案进行斜井通风.研究成果可为类似工程施工期通风方案的确定提供参考.
Optimization of Ventilation System Configuration during the Construction of L-Shaped Inclined Shafts of Tunnels
Aiming at the ventilation problem of tunnel L-shaped inclined shaft during the construction peri-od,a tunnel is taken as the support project,and numerical simulation software is adopted to simulate the tunnel with L-shaped inclined shaft,to analyse the ventilation effect under different combinations of fans and to opti-mize the ventilation of L-shaped inclined shaft.The results of the study show that the initial selection of the ventilation system during the construction period requires an air volume of 3491m3/min and an air pressure of 5230Pa.Considering that the line shape of the inclined shaft is L-type,three schemes that satisfy the initial se-lection requirements are compared,and the simulation reveals that the ventilation effect of the 2×160kw fan is better,but the average concentration of CO at the exit section is4.072×10-5m3/min,which is still out of com-pliance with the specification.On this basis,optimization is carried out,and 1 set of 75kw local fan is set at the corner,and the average concentration of CO at the exit section after optimization is 3.25×10-12kg/m3,which meets the specification requirements,and it is recommended that2×160kw(fan)+1×75kw(local fan)ventila-tion scheme should be selected for inclined shaft ventilation in this project.The research results can provide ref-erence for the determination of ventilation programme during the construction period of similar projects.

tunnel engineeringinclined shaft ventilationconstruction periodlocal fanconfiguration op-timization

崔光耀、陈然

展开 >

北方工业大学 土木工程学院,北京 100144

隧道工程 斜井通风 施工期 局扇 配置优化

2024

黑龙江工业学院学报(综合版)
鸡西大学

黑龙江工业学院学报(综合版)

影响因子:0.211
ISSN:1672-6758
年,卷(期):2024.24(7)