机械管理开发2024,Vol.39Issue(3) :244-245,248.DOI:10.16525/j.cnki.cn14-1134/th.2024.03.093

基于SolidWorks的风机部件新型工装的简述

Description of a New Type of Tooling for Fan Components Based on SolidWorks

贾晓辉 许嘉言 赵素芬
机械管理开发2024,Vol.39Issue(3) :244-245,248.DOI:10.16525/j.cnki.cn14-1134/th.2024.03.093

基于SolidWorks的风机部件新型工装的简述

Description of a New Type of Tooling for Fan Components Based on SolidWorks

贾晓辉 1许嘉言 1赵素芬1
扫码查看

作者信息

  • 1. 长江三峡集团江苏能源投资有限公司,江苏 南京 210000
  • 折叠

摘要

以江苏某海上风电场项目风机各部件的起吊和预拼为参照工程实例,详细介绍了金风科技风机叶片、轮毂、发电机和塔筒等部件进行起吊与预拼时采用新型工装的情况,为国内同类型工程的施工和安装提供了一种较为新颖、安全的起吊和预拼方式,具有推广应用价值.

Abstract

Taking the lifting and pre-assembly of wind turbine components of an offshore wind farm project in Jiangsu Province as a reference engineering example,the new type of tooling used in lifting and pre-assembly of blades,hubs,generators and tower components of wind turbines of Goldwind Technology is described in detail,which provides a novel and safe lifting and pre-assembly method for the construction and installation of the same type of projects in China,and it has the value of popularisation and application.

关键词

SolidWorks/风机部件/新型工装/起吊/支座

Key words

SolidWorks/wind turbine components/new type of tooling/lifting/support