Analysis and Prevention of Belt Breakage of Wire Rope Core Belt Conveyor in Tape Lane
In order to effectively solve the problem of wire rope core belt conveyor belt breakage,Jin Sheng Yixin Coal No.2 Coal Mining Project Ⅱ a plate area belt inclined alley as the object of study,in the main inclined shaft ST/S1250 steel wire rope core belt conveyor performance parameters and operation of the current situation based on the elaboration of an in-depth analysis of the causes of the breakage of the wire rope core belt,and relying on the operation of the practice of the proposed strategy of preventing the breakage of the belt,which can be used for the It can provide reference for the promotion and application of wire rope core belt conveyor in coal mine production.