Optimization and Improvement of Tungsten-Copper Alloy Parts Production Scheme Based on Tungsten-Copper Alloy
In order to solve the problem of irregular deviation of important dimensions of thin-walled tungsten-copper alloy box parts during continuous machining,the reasons for the deviation were deduced through measurement data collection,theoretical analysis and practical verification.The traditional program is improved to in-machine inspection and in-machine compensation program,and finally the small batch production is verified,and the important dimensions of the part dimensions are within the tolerance range by coordinate inspection,which indicates that the improved process is of great significance for the efficient continuous production of thin-walled tungsten-copper alloy box parts.
tungsten-copper alloythin-walled boxcoordinate inspectionprocess program