Simulation and Analysis of an Endoscopic Window for Sealed Box Chamber
The materials operated by the equipment in the nuclear chemical project have different degrees of radioactivity,so they are mostly carried out in the sealed chamber.In order to ensure the integrity of the sealing boundary,the inner peephole window has to withstand a variety of complex working conditions such as negative pressure,impact,fire,etc.without being destroyed.For a project to be used in a large window structure peephole carried out under negative pressure,impact and fire simulation analysis,and processing samples and test rig for verification,verification results and simulation results are basically consistent with the structure of the peephole is reliable,and can be promoted for use.