Improvement of the First Conveyor of EBZ200 Cantilever Roadheader
Due to the many underground geological formations,the first conveyor of the roadheader is frequently stuck in the gangue due to the hard rock in the production process,coupled with the limited driving capacity of the hydraulic system,which leads to difficulties in discharging the gangue from the conveyor,and seriously affects the progress of the roadheading.Based on this,the existing Sany Roadheader first conveyor drive from hydraulic motor drive to motor reducer drive.Design the head drive frame,add motor reducer,solve the current roadheader frequently jam gangue,hydraulic system drive torque is small,and ultimately achieve the purpose of improving the transport capacity of the roadheader.