Technical Measures for Lifting and Dragging and Translation of Reactor Equipment
This discussion analyzes the technical measures for reactor equipment hoisting and dragging translation.As the hoisting operation is a high-risk operation,the preliminary geological survey and confirmation of the hoisting space operation radius are directly related to the selection of cranes.Control the human machine,material,and environment before lifting to ensure the safe and reliable implementation of lifting operations.
polyester building reactorliftingdraggingtranslation