Optimized Design and Test of Monitoring Device for a Belt Conveyor
Aiming at the problems of incomplete remote monitoring parameters,insufficient fault protection ability and high labor intensity of workers in the monitoring device of belt conveyor in Nanzhai coal mine,the optimization scheme of belt conveyor monitoring device is proposed.On the basis of analyzing the structure of the belt conveyor,the control box,hardware and software ideas of the monitoring device are elaborated in detail,and finally the industrial test is completed.The test results show that the optimized monitoring device of the belt conveyor has complete monitoring parameters,strong fault protection ability,reduces the labor intensity of workers,improves the daily coal conveying capacity by 9.1%,and reduces the daily electricity consumption by 12.2%,which ensures the high efficiency,continuous and safe operation of the belt conveyor.
belt conveyormonitoring devicecontrol boxmaster-slave controlremote monitoring