考虑运输时间的混合流水车间绿色生产调度

扫码查看
针对运输时间对混合流水车间绿色生产调度的影响这一问题,以最大完工时间、生产能耗及生产成本为优化目标,提出一种改进的多目标麻雀搜索算法(Improved Multi-Objective Sparrow Search Algorithm,IMOSSA)进行求解,参考非支配排序将种群适应度值进行划分、引入正余弦策略提高解集质量、加入多项式变异算子和Levy飞行,提高解集的收敛速度和全局搜索能力,避免陷入局部最优。而后设计16种测试算例,将IMOSSA与其他多目标优化算法进行对比,验证了 IMOSSA求解的优越性。最后,以某实际生产车间为例,将其生产调度划分为4种模式,证明算法求解的实用性。
Green production scheduling of hybrid flow shop considering transportation time
Aiming at the influence of transportation time on green production scheduling of mixed flow workshop,the maximum completion time,production energy consumption and production cost were taken as optimization objectives.An Improved Multi-Objective Sparrow Search Algorithm(IMOSSA)was proposed to solve the problem.The fitness values of the population were di-vided by reference to non-dominated ordering,the quality of the solution set was improved by introducing sine-cosine strategy,and the convergence speed and global search ability of the solution set were improved by adding polynomial mutation operators and Levy flight,so as to avoid falling into local optimality.Then 16 test examples were designed to compare IMOSSA with other multi-objective optimization algorithms to verify the superiority of IMOSSA solution.Finally,taking an actual production workshop as an example,the production scheduling was divided into four modes to prove the practicability of the algorithm.

mixing flow shopgreen production schedulingunrelated parallel machinestransit timeMulti-Objective Sparrow Search Algorithm(MOSSA)

唐艺军、杜纪浩、李雪

展开 >

辽宁工程技术大学工商管理学院,葫芦岛 125000

混合流水车间 绿色生产调度 不相关并行机 运输时间 多目标麻雀搜索算法