首页|水利工程地基处理设计分析

水利工程地基处理设计分析

扫码查看
文中以安徽池州黄湓闸为例,通过比选分析黄湓闸地基处理方案,确定采用管桩复合地基处理.结果表明,采用搅拌桩与刚性桩组合形成复合地基,较好地解决了建筑物沉降及水平变形控制问题,采用预应力钢筋混凝土管桩、塑性混凝土垫层,加快了施工进度,保证了施工质量,可较好地满足水利工程度汛要求.
Design Analysis of Foundation Treatment of Water Conservancy Project
This paper takes the Yellow River Sluice Gate in Chizhou,Anhui Province as an example to analyze the project and finally adopt the tubular pile composite foundation treatment.Practice has proved that the composite foundation formed by mixing pile and rigid pile can better solve the problems of building settlement and horizontal deformation control,and the prestressed reinforced concrete pipe pile and plastic con-crete cushion can speed up the construction progress and ensure the construction quality,and can better meet the flood control requirements of water conservancy projects.

Huangpen sluiceMucky soilFoundation treatmentPipe pile

陈杰

展开 >

安徽省水利水电勘测设计研究总院有限公司,安徽 合肥 230088

黄湓闸 淤泥质土 地基处理 管桩

2024

江西建材
江西省建材科研设计院

江西建材

影响因子:2.247
ISSN:1006-2890
年,卷(期):2024.(1)
  • 6