高速公路连接线纳入丹平隧道施工技术研究
Research on Optimal Design of Construction Organization for Highway Link Incorporating Danping Tunnel
高鑫 1焦方明 1江子豪2
作者信息
- 1. 山东省路桥集团有限公司,山东 济南 250014
- 2. 山东科技大学,山东 青岛 266590
- 折叠
摘要
为了确保隧道的安全性和施工进度,文中对高速公路连接线纳入丹平隧道的隧道施工组织进行了研究,采用新奥法进行隧道结构设计,确定了隧道的施工工序和施工方案,从施工前期到施工全过程进行风险控制,确保隧道工程技术安全,制定施工全过程的监测方案,通过对围岩和支护结构的观察以及动态测量,合理安排施工步骤,以确保施工安全并调整设计参数.此外,该方案还包括日常施工管理措施,旨在积累相关数据.
Abstract
In order to ensure the safety and construction progress of the tunnel,the tunnel construction organization of the highway link incorpo-rating the Danping Tunnel is studied.The tunnel structure design is carried out by adopting the Xin'ao method,which determines the construc-tion process and construction program of the tunnel,and carries out risk control from the pre-construction stage to the whole process of con-struction to ensure the safety of the tunnel engineering technology,and then develops a monitoring program for the whole process of construc-tion,which can realize the rational arrangement of construction procedures,ensure the safety of the construction,correct the design parame-ters,carry out the daily construction management,and accumulate the data.
关键词
施工组织设计/监测量测/新奥法Key words
Construction organization design/Monitoring and measuring/Neo-Australian method引用本文复制引用
出版年
2024