江西建材2024,Issue(2) :289-291.

栈桥钢管混凝土柱水下浇筑桩芯超灌高度控制技术

Control Technology for the Over-filling Height of the Underwater Pouring Pile Core of the Steel Tube Concrete Column of the Trestle Bridge

章良兵 陈嘉威
江西建材2024,Issue(2) :289-291.

栈桥钢管混凝土柱水下浇筑桩芯超灌高度控制技术

Control Technology for the Over-filling Height of the Underwater Pouring Pile Core of the Steel Tube Concrete Column of the Trestle Bridge

章良兵 1陈嘉威1
扫码查看

作者信息

  • 1. 中航勘察设计研究院有限公司,北京 100098
  • 折叠

摘要

某深基坑栈桥临时竖向支撑柱采用钢管混凝土柱,为一柱一桩结构,在一次性水下混凝土浇筑时,桩芯超灌量影响后续基坑土方开挖过程中混凝土的剔凿量,而剔凿产生的振动可能影响钢管混凝土柱的承载能力.文中通过比选垂直插入法、封顶钢板法,分析了桩芯超灌量的影响因素,提出了混凝土水下灌注及桩孔同步回填工艺,并介绍了具体的施工流程.

Abstract

The temporary vertical support column of a certain deep foundation pit pier adopts a steel pipe concrete column,which is a one column,one pile structure.When pouring concrete underwater in one go,the excessive pouring of the pile core affects the amount of concrete chiseled during the subsequent excavation process of the foundation pit.The vibration generated by chiseling may affect the bearing capacity of the steel pipe concrete column.In the article,by comparing the vertical insertion method and the capped steel plate method,the influencing factors of pile core overfilling were analyzed.The underwater concrete pouring and synchronous backfilling technology of pile holes were proposed,and the specific implementation process was introduced.

关键词

钢管混凝土柱/水下混凝土浇筑/超灌面高度

Key words

Concrete filled steel tube/Underwater concreting/The height of over-concreting

引用本文复制引用

出版年

2024
江西建材
江西省建材科研设计院

江西建材

影响因子:2.247
ISSN:1006-2890
参考文献量9
段落导航相关论文