Research on Quality Supervision and Control of Pile Foundation Engineering
In this article,the quality supervision and control methods of the pile foundation project in the central residential area are studied as an example.The specific work procedures of quality supervision are summarized,and the key points and objectives of quality control are ana-lyzed.Corresponding control measures are proposed in three stages:pre control,in-process control,and post control,including strict accept-ance of construction materials,conducting pile testing work,controlling pile pressure,and controlling pipe pile splicing,in order to provide ef-fective reference for similar projects.
Pile foundation engineeringQuality supervisionControl measures