Research on High Support Construction Technology of Concrete Formwork for Warehouse Floor
Taking a bonded warehouse project as an example,this article analyzes the construction process of high support for floor concrete formwork,elaborates on the hardening treatment of the support foundation,installation of sweeping rods,horizontal rods,shear braces,and beam formwork,preloading and observation of settlement to ensure the stability of the support meets the standard.Finally,the formwork is re-moved after the concrete strength meets the standard,in order to provide reference for type of engineering construction.
High formworkConcrete formworkFull hall bracketSupport preloading