首页|德尔加杜角省N14国道改造项目合同风险研究

德尔加杜角省N14国道改造项目合同风险研究

扫码查看
为科学有效评价国际工程项目合同风险,提高项目合同风险预防能力,本文首先基于文献调研法,构建了由4 个一级指标和16 个二级指标组成的国际工程项目合同风险指标体系;其次利用区间组合数有序加权算子对指标进行赋权,将区间组合数有序加权算子与可拓云模型有机结合,构建了国际工程项目合同风险评价模型;最后选取了德尔加杜角省N14 国道改造项目分析该模型的适用性.
Contract Risk Study of N14 National Highway Reconstruction Project in Cape Delgado Province
In order to scientifically and effectively evaluate the risk of international engineering project contract and improve the risk prevention ability of project contract,this paper firstly constructed an international engineering project contract risk index system composed of 4 first-level indexes and 16 second-level indexes based on literature research method.Secondly,COWA was used to assign value to the index,and COWA was combined with extension cloud model to construct the risk assessment model of international engineering project contract.Finally,the N14 national highway reconstruction project in Cabo Delgado Province was selected to analyze the applicability of the model.

COWAExtension cloud modelInternational engineering projectsContract risk assessment

程斌、苏恒恒

展开 >

中国江西国际经济技术合作有限公司,江西 南昌 330000

南昌大学工程建设学院,江西 南昌 330000

COWA 可拓云模型 国际工程项目 合同风险评价

2024

江西建材
江西省建材科研设计院

江西建材

影响因子:2.247
ISSN:1006-2890
年,卷(期):2024.(3)
  • 8