首页|某污水处理厂提标改造工程设计探析

某污水处理厂提标改造工程设计探析

扫码查看
文中以某污水处理厂为例,结合现状处理工艺及进出水水质分析,进行深度处理工艺比较,选择合适的工艺,计算相关构筑物尺寸,并分析竣工调试阶段存在的问题,该污水处理厂出水水质从GB 18918-2002《城镇污水处理厂污染物排放标准》规定的一级B标准提升至一级A标准.
Design and Analysis of Upgrading Project of a Sewage Treatment Plant
This paper takes a sewage treatment plant as an example,analyzes the current treatment process of the treatment plant and the water quality of the incoming and outgoing water,compares the advanced treatment process,chooses the appropriate process,calculates the size of related structures,and analyzes the problems existing in the completion and commissioning stage.The effluent quality of the sewage treatment plant from the GB18918-2002"Urban sewage Treatment plant pollutant discharge standard"in the first class B standard to the first class A standard.

Sewage treatment plantUpgrading the standardHigh efficiency sedimentation tankFiber rotary disk filter

宋如

展开 >

福建省建筑设计研究院有限公司,福建 福州 350000

污水处理厂 提标改造 高效沉淀池 纤维转盘滤池

2024

江西建材
江西省建材科研设计院

江西建材

影响因子:2.247
ISSN:1006-2890
年,卷(期):2024.(3)
  • 7