Research on Flood Control and Reinforcement Engineering of Canal Head Hub in Kashgar,Xinjiang
Taking Yingawati Canal head junction flood control reinforcement project in Kashgar area of Xinjiang as an example,this paper puts forward canal head reconstruction and flood control reinforcement scheme,and analyzes the main geological problems in the engineering area.The results show that the surface water in the project area has weak corrosion to concrete,steel bar and steel structure.The sand in this layer is only partially non-uniform,and the fine sand above 9 m is liquifiable soil.The research results can provide some reference for the water conservancy construction in Kashgar area of Xinjiang.
Canal headWater conservancy hubFlood control reinforcement