首页|竖向后浇带预制加强型钢板式模板免拆施工技术研究

竖向后浇带预制加强型钢板式模板免拆施工技术研究

扫码查看
文中以某住宅项目地下室为例,探讨了一种新型的竖向后浇带防护技术.该技术采用竖向后浇带预制加强型钢板式模板免拆施工技术,通过焊接连接钢板和方通等材料形成主体框架,并以钢板作为防护板,起到有效防护作用.针对传统方法存在的施工周期长、成本高、质量不稳定等问题,本研究提出的技术具有施工周期短、成本低、施工质量稳定等优势.实践证明,该技术在地下室竖向后浇带防护方面具有良好的应用前景和推广价值.
Vertical Pre-cast Reinforced Steel Plate Formwork for Belt Concrete Pouring(BCP)Construction Technology
This study investigates a novel vertical belt concrete pour(BCP)protection technique,using a residential project's basement as a case study.The technique employs a prefabricated reinforced steel plate formwork for vertical BCP protection,welding steel plates and steel channels to form the main frame and using steel plates as protective panels.Addressing issues such as long construction periods,high costs,and unstable quality associated with traditional methods,the proposed technique offers advantages of shorter construction periods,lower costs,and stable construction quality.Practical application demonstrates promising prospects and promotional value for this technique in vertical BCP protection for basements.

BasementBelt Concrete Pour(BCP)ProtectionSteel plate formworkConstruction periodCostConstruction quality

潘方贤

展开 >

广西大兴建设集团有限公司,广西 南宁 530000

地下室 后浇带防护 钢板式模板 施工周期 成本 施工质量

2024

江西建材
江西省建材科研设计院

江西建材

影响因子:2.247
ISSN:1006-2890
年,卷(期):2024.(4)
  • 6