Design Analysis of Rural Domestic Sewage Collection Engineering
The article takes the first phase of the comprehensive water environment management and ecological corridor construction project in the Xixi(Nanjing area)watershed of the Jiulong River as an example.Through on-site investigation of the current drainage system,drainage volume,and rainwater and sewage discharge situation of key villages in the watershed,as well as the collection and organization of existing da-ta,combined with the actual situation on site,two treatment modes are adopted to collect and treat the source sewage of 23 villages.The results show that the sewage collection rate has basically reached 80%.
Rural domestic sewage collection designProcessing modeKey points of intercepting well design