首页|景洪至勐海高速公路流沙问题及加固措施

景洪至勐海高速公路流沙问题及加固措施

扫码查看
景洪至勐海高速公路ZK38+220—K38+370 段受鳄鱼谷景区影响,征地范围有限,文中根据地形及常规横断面设计方法,采用桩板墙处理方式解决该问题,但在进行抗滑桩人工挖孔时,出现了较为严重的流沙现象,无法继续向下挖孔,导致停工.经过地勘及稳定计算分析,通过放陡填方边坡,采用加筋土路堤加固、在各级边坡间设置平台的方式,降低坡脚路堤高度,缩小征地范围,在第三级边坡坡脚设置抗滑挡墙,在坡脚软弱土层采用水泥搅拌桩进行深层处理,解决该高填方路堤工程的征地及流沙问题.
Quicks and Problem and Reinforcement Measures of Jinghong to Menghai Expressway
Section ZK38+220—K38+370 of Jinghong-Menghai Expressway is affected by Crocodile Valley scenic spot during construction,and the land acquisition scope is limited.According to the terrain and the conventional cross-sectional design method,the pile slab wall treat-ment method is adopted to solve the problem.However,when the anti-slide pile was dug manually,there was a more serious quicksand phe-nomenon,and it could not continue to dig down the hole,resulting in a shutdown.Through geological prospecting and stability calculation and analysis,the slope slope is steeped,reinforced with reinforced soil embankment,and platforms are set between slopes to reduce the embank-ment height and narrow the land requisition range.By setting the anti-slip retaining wall at the foot of the third grade side slope and using ce-ment mixing pile for deep treatment of the weak soil layer at the foot of the slope,the land acquisition and quicksand problems of the high fill embankment project are well solved,which provides a certain reference value for the subsequent related projects.

High fill embankmentQuicksandAnti-skid retaining wallCement mixing pile

代彦芹、陈德令、魏业清

展开 >

云南水利水电职业学院,云南 昆明 650499

云南省交通规划设计研究院有限公司,云南 昆明 650106

高填方路堤 流沙 抗滑挡墙 水泥搅拌桩

2024

江西建材
江西省建材科研设计院

江西建材

影响因子:2.247
ISSN:1006-2890
年,卷(期):2024.(5)