Progress Control Method of Housing Construction EPC Project Based on BIM Technology
The traditional EPC project schedule control method for building construction directly selects key construction control points,but lacks in-depth analysis of engineering quantity,resource requirements,and project progress,resulting in poor schedule control effectiveness.Therefore,this article proposes a progress control method for building EPC projects based on BIM technology.Firstly,construct a BIM model for the construction EPC project,and compare and analyze the cost schedule and visual schedule using Primavera 6 schedule management soft-ware and Navisworks software,selecting key construction control points;then,based on BIM technology,real-time monitoring of project pro-gress and cost operation is carried out,and the earned value method is used to conduct in-depth analysis of schedule deviations,formulate cor-responding corrective measures,and thus achieve progress control of building EPC projects based on BIM technology;finally,analyze the pro-gress management advantages of BIM technology from the early stages of the project,the project implementation process,and the different sta-ges after project execution.