Research on Construction Technology of Steel Trestle in Rapid Flow and Bare Rock Environment in Reservoir
In the article,based on practical engineering,the construction technology of steel wharf under the environment of rapid flow and bare rock in the reservoir area is proposed.The method is analyzed and calculated to verify its applicability under the conditions of rapid flow and bare rock in the reservoir area.At the same time,parameter analysis is conducted on the water flow velocity of the steel wharf.For every 1 m/s increase in flow velocity,the maximum stress of the steel pipe pile only increases by 0.1 MPa.The results show that the construction method can meet the construction requirements,and the water flow rate in the rapid flow environment is not the main factor for stress calculation of the steel trestle.The rapid flow environment mainly affects the positioning accuracy of the steel trestle.
Steel trestleRapids bare rockConstruction technology