Research on the Overall Jacking Correction Construction of Steel Structure Workshop
Steel structure workshop has been widely used in modern industrial buildings because of its light structure and rapid construction.However,due to the geological conditions or use environment,the plant may appear inclined phenomenon,which seriously affects its safety and use function.This paper studies the construction technology of steel structure workshop.In view of the consistent tilt problem of the plant,the comprehensive construction scheme is proposed,including the key measures such as foundation reinforcement,supporting structure system set-ting,jack configuration and displacement control.Through strict control of the construction process and real-time monitoring,to ensure the ac-curacy and safety of the jacking correction.
Steel structure workshopJacking correctionConstruction measuresConstruction process