首页|建筑工程施工过程中基坑受力变形特点研究

建筑工程施工过程中基坑受力变形特点研究

扫码查看
文中对某建筑基坑开挖过程中地表沉降、支护结构内力和变形情况进行监测分析.结果表明,锚索轴力变化趋势主要分为轴力减小、轴力缓慢上升以及轴力趋于稳定三个过程.在基坑开挖过程中,从基坑侧壁开始向基坑内 5m范围内,沉降量逐步增大,并在5m处达到最大值.与基坑侧壁距离超过5m时,随着距离的增加,沉降量开始迅速减小,并在距离开挖面15m以外时降低为零.在基坑开挖深度为-3m时,作用在支护桩上的主动土压力相对较低,支护桩的形变几乎为零;随着开挖深度的增加,支护结构的最大位移逐渐出现在基坑上部区域,且支护桩位移峰值发生在约0.5 倍的基坑深度处,而非桩顶位置.
Research on the Characteristics of Stress and Deformation of Foundation Pits During the Construction Process of Building Engineering
The surface settlement,internal force and deformation of the supporting structure are monitored and analyzed during the excavation of the foundation pit of a building.The results show that the variation trend of the axial force of the anchor cable is mainly divided into three processes:the decrease of the axial force,the slow increase of the axial force and the stabilization of the axial force.In the excavation process of the foundation pit,the settlement gradually increases from the side wall of the foundation pit to about 5 m in the foundation pit,and reaches the maximum value at 5 m.Once the distance from the side wall of the foundation pit exceeds 5 m,with the increase of distance,the settle-ment begins to decrease rapidly,and decreases to zero when it is 15 m away from the excavation face,and when the excavation depth of the foundation pit is-3 m,the active earth pressure acting on the supporting pile is relatively low,and the deformation of the supporting pile is al-most zero.With the increase of excavation depth,the maximum displacement of the supporting structure gradually appears in the upper area of the foundation pit,and the peak displacement of the supporting pile occurs at about 0.5 times the depth of the foundation pit,rather than the top position of the pile.

High-rise buildingsExcavation engineeringDeformation under stressSupporting structure

张秋利

展开 >

北京燕化天钲建筑工程有限责任公司,北京 102502

高层建筑 基坑工程 受力变形 支护结构

2024

江西建材
江西省建材科研设计院

江西建材

影响因子:2.247
ISSN:1006-2890
年,卷(期):2024.(9)