首页|古建筑文物保护项目基坑地下水控制、支护设计优化实践

古建筑文物保护项目基坑地下水控制、支护设计优化实践

扫码查看
项目建设过程中,需要对地下水采取控制措施,以确保项目开挖和施工的安全,地下水控制措施可分为帷幕隔水、降水、帷幕隔水和降水结合等方法,根据项目工程所在地、项目水文地质和工程地质条件、项目周边环境、当地政策要求的不同,应采取最优的地下水控制方案,以达到施工的安全、可行、绿色环保及经济目标.
Optimization Practice of Groundwater Control and Support Design of Foundation Pit for Ancient Building Cultural Relics Protection Project
During the construction of the project,it is necessary to take control measures on groundwater to ensure the safety of project excava-tion and construction,groundwater control measures can be divided into curtain water separation,precipitation,curtain water isolation and pre-cipitation combination,etc.according to the project location,project hydrogeology and engineering geological conditions,project surrounding environment,local policy requirements,the optimal groundwater control scheme should be adopted to achieve the safety,feasibility,green en-vironmental protection.

Palace MuseumGroundwater controlDesign optimization

巫冬妹

展开 >

北京建材地质工程公司,北京 100102

故宫博物院 地下水控制 设计优化

2024

江西建材
江西省建材科研设计院

江西建材

影响因子:2.247
ISSN:1006-2890
年,卷(期):2024.(9)