机械研究与应用2024,Vol.37Issue(3) :78-82.DOI:10.16576/j.ISSN.1007-4414.2024.03.022

机器人制造单元集成式工艺规划与调度方法

The Methods of Robotic Manufacturing Cell Integrated Process Planning and Scheduling

彭远刚 谢思晨 曾文玉 姜瑞森 李明富
机械研究与应用2024,Vol.37Issue(3) :78-82.DOI:10.16576/j.ISSN.1007-4414.2024.03.022

机器人制造单元集成式工艺规划与调度方法

The Methods of Robotic Manufacturing Cell Integrated Process Planning and Scheduling

彭远刚 1谢思晨 2曾文玉 2姜瑞森 2李明富2
扫码查看

作者信息

  • 1. 深圳市亚辉龙生物科技股份有限公司,广东 深圳 518116;长沙亚辉龙生物科技有限公司,湖南 长沙 411000
  • 2. 湘潭大学 机械工程与力学学院,湖南 湘潭 411105
  • 折叠

摘要

文章针对机器人制造单元集成式工艺规划与调度(RMC-IPPS)问题,并考虑其加工次序柔性、加工柔性及工序柔性,提出了一种多层级线性编码的方法,该方法能有效地将RMC-IPPS问题的解用简单的数据结构表示,并实现对问题的整体求解.同时,针对毛坯件/半成品在单元中的转运问题,设计了一种基于贪婪思想的机器人调度策略,该策略每一步都选择当前的最优状态,使生产周期尽量不因搬运工序的存在而产生过多延滞.最后,设计出一种基于外部档案库的NSGA-Ⅱ算法(M-NSGA-Ⅱ),该算法通过外部档案库对非劣解进行二次搜索,以避免种群多样性趋于单一,并通过基准实例与实际生产应用算例对所提方法进行验证,并将改进后的算法与其它算法进行对比.结果表明,相较标准NSGA-Ⅱ算法,M-NSGA-Ⅱ算法的覆盖率为 100%;相较文献中的算法,M-NSGA-Ⅱ算法具有更高的覆盖率.

Abstract

Aiming at the robotic manufacturing cell integrated process planning and scheduling(RMC-IPPS)problem,con-sidering the flexibility of features,processing and machines,a multi-level linear coding method is proposed.By using this method,the solution of RMC-IPSS problem can be expressed with simple data structure effectively,meanwhile,the two prob-lems can be solved integrally.At the same time,for the sake of solving the transport problem of semi-finished products in the cell,the robots scheduling strategy based on the greedy algorithm is designed.In this strategy,each operation adopts the cur-rent optimal state to avoid the delay caused by the carrying works of production cycles.Finally,in order to increase the diversi-ty of population,an improved NSGA-Ⅱ algorithm with external archives(M-NSGA-Ⅱ)is designed.The main idea of this algorithm is searching the noninferior solutions in the external archives.Furthermore,the approach is tested on benchmark in-stances and practical data instances.Compared with the standard NSGA-Ⅱalgorithm,the coverage of the M-NSGA-Ⅱalgo-rithm is 100%;moreover,the M-NSGA-Ⅱ algorithm has a higher coverage than others in the references.

关键词

集成式工艺规划与车间调度/机器人制造单元/多层级线性编码/NSGA-Ⅱ

Key words

integrated process planning and scheduling/robotic manufacturing cells/multi-level linear coding method/NS-GA-Ⅱ

引用本文复制引用

出版年

2024
机械研究与应用
甘肃省机械科学研究院

机械研究与应用

影响因子:0.267
ISSN:1007-4414
参考文献量3
段落导航相关论文