首页|大型LNG储罐焊接质量管理

大型LNG储罐焊接质量管理

扫码查看
随着中国清洁能源的全面化发展,国内LNG储罐也是在大规模的建设中,截止目前中国已经有26座大型LNG接收站,储罐的设计施工也由最先的国外承包商全部国产化,标志着中国已经完全掌握了 LNG储罐及接收站的设计、施工能力.其中储罐建造过程中的一大难点就是内罐的焊接管理,因储罐投产后一直在超低温状态下运行,且无法进行返修处理,因此焊接的质量极其重要.文中就LNG储罐的焊接管理从多方面、多维度进场总结,供行业参考.
Welding quality management of large LNG storage tank
With the comprehensive development of clean energy in China,the construction of LNG storage tanks in China is also under way on a large scale.Up to now,there have been 26 large LNG receiving stations in Chi-na,the design and construction of LNG storage tanks are all made in China by the first foreign contractor,which indicates that our country has fully mastered the design and construction capacity of LNG storage tanks and re-ceiving stations.One of the difficulties in the process of tank construction is the welding management of the in-ner tank.The quality of welding is very important because the tank has been running at ultra-low temperature and can not be repaired.This paper summarizes the welding management of LNG storage tank from various as-pects and dimensions,for industry reference.

LNG tankweldingexperiencequality

丁小见

展开 >

安徽长江液化天然气有限责任公司,安徽芜湖 241000

LNG储罐 焊接 经验 质量

2024

机械制造文摘-焊接分册
机械科学研究院哈尔滨焊接研究所

机械制造文摘-焊接分册

影响因子:0.092
ISSN:
年,卷(期):2024.(1)
  • 1
  • 8