In order to meet the requirements of process development in the cigarette factory,the existing unused factory building must be utilized and its capacity increased.This paper analyzes and researches the renovation of an additional substation in the existing cigarette factory building,including the selection of the substation site,the analysis of equipment load,the configuration of high and low voltage switchgears,the power supply design,the establishment of a smart management system,and other aspects.
关键词
烟厂/变电所选址/荷载分析/变电所/高低压柜布置/智能化管理系统/短路电流/单母线分段
Key words
cigarette factory/selection of the substation site/load analysis/substation/layout of HV and LV cabinets/smart management system/short-circuit current/single bus segment