In this paper,the electrical pipe and wire detached from skeleton technology for prefabricated residential buildings is discussed and innovated based on practical engineering projects.In addition to the traditional method for pipe and wire detached from skeleton based on the ceiling space and dry floor/ground,it summarizes and proposed a brand-new electrical pipe and wire detached from skeleton technology that does not rely on the ceiling void.This new technology is developed according to the general idea of reducing the total pipe and wire quantity,combining open installation with concealed installation,and reservation of functions for optional application in prefabricated projects.
关键词
装配式/居住建筑/建筑电气/管线分离/快装产品/无线动能开关/明暗转换/预制墙体构件
Key words
prefabricated/residential building/building electricity/pipe and wire detached from skeleton/quick installation product/wireless kinetic energy switch/open-to-concealed installation/prefabricated wall member