王家寨特长隧道独头掘进超过6.5千米施工通风关键技术研究

扫码查看
云南临沧临翔至清水河高速公路王家寨隧道全长 8040m,进出口同时掘进,但由于进口段特殊不良地质施工进度缓慢,出口端超长距离独头掘进了近 6500m,超过了秦岭终南山隧道 6300m独头通风的世界纪录。工程施工通风降尘及水、电成为了超长距离掘进十分棘手的制约因素,隧道施工过程中超长距离掘进以及内燃机排放、爆破后的粉尘等因素使通风成为一项重要挑战,王家寨隧道采用压入式和压入式+接力通风方式,成功解决了独头掘进超过 6500m的施工通风难题。文章还详细介绍了隧道施工所需的通风计算方法,通风设备配置,施工环境安全标准和通风效果实时监测等方面的技术。这项研究对于类似长大隧道的长距离独头掘进施工通风提供了经验和参考。
Research on Key Ventilation Technologies for the Construction of Wangjiazhai Extra Long Tunnel with Over 6.5 Kilometers of Single Head Excavation
The Wangjiazhai Tunnel on the Linxiang Qingshuihe Expressway in Lincang,Yunnan has a total length of 8040m.The entrance and exit tunnels are excavated simultaneously.However,due to the special unfavorable geological conditions of the entrance section,the construction progress is slow,and the exit end has been excavated for nearly 6500m in a long distance,exceeding the world record of 6300m single head ventilation for the Qinling Zhongnan Mountain Tunnel.Ventilation and dust reduction in engineering construction,as well as water and electricity,have become very difficult constraints for ultra long distance excavation.During tunnel construction,factors such as ultra long distance excavation,internal combustion engine emissions,and dust after blasting make ventilation an important challenge.The Wangjiazhai Tunnel adopts pressure and pressure+relay ventilation methods,successfully solving the construction ventilation problem of single head excavation exceeding 6500 meters.The article also provides a detailed introduction to the ventilation calculation methods,ventilation equipment configuration,construction environment safety standards,and real-time monitoring of ventilation effects required for tunnel construction.This study provides experience and reference for ventilation in long-distance single head excavation construction similar to long tunnels.

extra long tunnelultra long distance single head ventilationconstruction ventilation technologyventilation calculationgeothermal energy

李宝华、黄元楼、钱江

展开 >

云南临沧临清高速公路有限公司,临沧 677000

云南交投集团云岭建设有限公司,昆明 650100

特长隧道 超长距离独头通风 施工通风技术 通风计算 地热