摘要

堆石坝填筑是控制抽水蓄能电站水库施工质量的关键工序,合格的填筑质量是大坝安全运行的关键和核心,优化施工工序、严控填筑质量对于抽水蓄能电站的造价和安全具有较大影响,对于发挥电站的技术和经济效益也具有重要意义.

Abstract

The filling of a rock-fill dam is a key process for controlling the construction quality of a pumped storage power station reservoir.Qualified filling quality is the key and core to the safe operation of the dam.Optimizing the construction process and strictly controlling the filling quality have a significant impact on the cost and safety of pumped storage power stations,and are also of great significance for maximizing the technical and economic benefits of the power station.

关键词

堆石坝/填筑/质量

Key words

rock-fill dam/filling/quality