Application of"Stacking+Reaction Force"Preloading Technology in Hanging Basket Preloading
Taking the Qujiang extra large bridge as an actual engineering case,this article introduces the working principle,construction organization,observation methods,and key points of the"stacking+reaction force"preloading technology in the hanging basket preloading.The results indicate that this method has the advantages of high safety,strong operability,and good preloading effect.At the same time,it can achieve the goal of reducing material input and saving construction costs.The successful application of this engineering technology also provides useful reference for the preloading of heavy-duty hanging baskets.
reaction force preloadingstacking preloadinghanging basket