摘要
为确保跨桥梁钢筋混凝土连续梁施工工程质量,进入冬季施工严格按照冬季施工要求进行;本文结合工程实例,从混凝土配合比、混凝土拌合、浇筑及养护等几方面入手,提出了钢筋混凝土连续梁冬季施工有效措施并给出了合理的施工方案,为钢筋混凝土连续梁冬季施工做出了探索性研究。
Abstract
In order to ensure the construction quality of reinforcedconcrete continuous beam across bridges, the construction into winteris strictly in accordance with the requirements of winter construction.This paper combines engineering examples, starting from concrete mixratio, concrete mixing, pouring and curing, and puts forward reinforcedconcrete.The effective measures for continuous beam constructionin winter and the reasonable construction scheme were given, andan exploratory study was carried out for the winter construction ofreinforced concrete continuous beams.