建筑工程技术与设计2018,Issue(35) :704-705.

替代剪力墙间砌体的空心混凝土墙施工技术

Construction technology of hollow concrete wall instead ofmasonry between

建筑工程技术与设计2018,Issue(35) :704-705.

替代剪力墙间砌体的空心混凝土墙施工技术

Construction technology of hollow concrete wall instead ofmasonry between

扫码查看

摘要

本文针对剪力墙间填充墙施工 , 提出采用空心混凝土墙替代砌体的施工技术,在填充墙位置布置 PVC 管,填充墙与剪力墙交接处采用结构拉缝板分割,填充墙与剪力墙一同浇筑。该施工技术解决了传统砌体施工工期长、资源浪费、易渗漏的缺陷,具有操作简便、效率高、成本低、施工质量好的特点,是一种节能环保的建筑施工技术。

Abstract

According to the construction of filling wall betweenshear walls, this paper puts forward the construction technology of usinghollow concrete wall instead of masonry.PVC pipes are arranged in theposition of filling wall, and the joints of filling wall and shear wall aredivided by structural seam plates, and the filling wall and shear wall arepoured together.The construction technology solves the defects of longconstruction period, waste of resources and easy leakage of traditionalmasonry.It has the characteristics of simple operation, high efficiency,low cost and good construction quality.It is an energy-saving andenvironmental protection construction technology.

关键词

空心混凝土墙/PVC//结构拉缝板

Key words

Hollow concrete wall;PVC pipes;Structural seamplates

引用本文复制引用

出版年

2018
建筑工程技术与设计

建筑工程技术与设计

影响因子:0.156
ISSN:
段落导航相关论文