Research on Planning of Intelligent Curtain Wall Construction Schedule Based on IGA
The accelerated growth of urban high-rise structures has led to the necessity for a more effective and intelligent approach to the planning of curtain wall construction schedules.The objective of this study is to propose an intelligent planning method for curtain wall construction schedules based on an improved genetic algorithm.After an analysis of the characteristics of curtain wall construction,an optimization model of curtain wall construction schedule with the shortest duration is established by considering the conflict of high-altitude cross-construction operations and the constraints of construction unit conversion.The improved genetic algorithm is then used to solve the model,resulting in the construction schedule with the shortest duration.Furthermore,the methodology was validated and applied in an actual commercial office building project.The results demonstrate that the intelligent scheduling method can markedly reduce the construction duration,considering various constraints.The findings of this study can serve as a reference for the schedule planning of similar curtain wall construction projects.
energy efficient curtain wallscheduleoptimization methodimproved genetic algorithm