为研究半灌浆套筒于不同位置处连接预拼桥墩的抗震性能,设计制作了 3 个套筒分别位于墩身顶部(YZD-T试件)、中部(YZD-M试件)、和底部(YZD-B试件)连接的预拼桥墩试件和1 个整体现浇桥墩试件(XJD试件),通过低周反复加载试验研究了各试件的抗震性能.研究表明:半灌浆套筒连接的预拼桥墩试件与整体现浇桥墩试件均呈弯曲破坏且具有较强承载力;各预拼桥墩试件位移延性系数差在 5%范围内,且均小于整体现浇试件;YZD-M试件屈服位移最大;YZD-T试件和YZD-B试件破坏时,YZD-M试件的刚度分别比XJD、YZD-T试件和YZD-B试件高8.26%、13.53%和 20.02%,其累计耗能与 XJD 试件相差不大,分别比 YZD-T 试件和 YZD-B 试件大 1.95%和23.72%.相较而言,预拼桥墩试件中,位于墩身中部连接的预拼桥墩试件抗震性能最好,可作为预拼桥墩设计时的推荐方案.
Experimental study on seismic performance of pre-assembled bridge piers with semi-grouting sleeves connected at different positions
In order to study the seismic performance of pre-assembled bridge piers connected with semi-grouting sleeves at different positions,three pre-assembled bridge piers connected with sleeves at the top(YZD-T specimen),middle(YZD-M specimen)and bottom(YZD-B specimen)of the pier body and one integral cast-in-place bridge pier specimen(XJD specimen)were designed and fabricated.The seismic performance of each specimen was studied by low-cycle repeated loading test.The research shows that the pre-assembled bridge piers connected with semi-grouting sleeves and the integral cast-in-place bridge pier specimen are both flexural failure and have strong bearing capacity.The difference of displacement ductility coefficient of each pre-assembled bridge pier specimens is within 5%,and it is smaller than that of the integral cast-in-place specimen.The yield displacement of YZD-M specimen is the largest.When the YZD-T specimen and the YZD-B specimen are destroyed,the stiffness of the YZD-M specimen is 8.26%,13.53%and 20.02%higher than that of the XJD,YZD-T specimen and the YZD-B specimen,respectively.The cumulative energy consumption is not much different from that of the XJD specimen,which is 1.95%and 23.72%larger than that of the YZD-T specimen and the YZD-B specimen,respectively.In contrast,among the pre-assembled pier specimens,the pre-assembled pier specimens connected in the middle of the pier have the best seismic performance and can be used as a recommended scheme for the design of pre-assembled piers.

pre-assembled bridge piersemi-grouting sleeveseismic performanceconnection position

吴胤良、卢海林

展开 >

武汉工程大学土木工程与建筑学院,武汉 430074

绿色土木工程材料与结构湖北省工程研究中心,武汉 430074

预拼桥墩 半灌浆套筒 抗震性能 连接位置

武汉市城建委科技项目百色市科学研究与技术开发计划

20180420221481

2024

建筑结构
中国建筑设计研究院 亚太建设科技信息研究院 中国土木工程学会

建筑结构

CSTPCD北大核心
影响因子:0.723
ISSN:1002-848X
年,卷(期):2024.54(10)