建筑结构2024,Vol.54Issue(14) :23-30.DOI:10.19701/j.jzjg.20220230

开槽侧板加强型连接梁柱节点子结构抗连续倒塌性能研究

Study on progressive collapse resistance performance of beam-column joint substructure with grooved side plate reinforced connection

张旺 王岩 刘红波 熊清清 贾世杨 苏天成
建筑结构2024,Vol.54Issue(14) :23-30.DOI:10.19701/j.jzjg.20220230

开槽侧板加强型连接梁柱节点子结构抗连续倒塌性能研究

Study on progressive collapse resistance performance of beam-column joint substructure with grooved side plate reinforced connection

张旺 1王岩 2刘红波 3熊清清 1贾世杨 2苏天成4
扫码查看

作者信息

  • 1. 天津大学建筑工程学院,天津 300072;石家庄铁道大学土木工程学院,石家庄 050043;大立建设集团有限公司,杭州 311215
  • 2. 石家庄铁道大学土木工程学院,石家庄 050043
  • 3. 天津大学建筑工程学院,天津 300072
  • 4. 大立建设集团有限公司,杭州 311215
  • 折叠

摘要

为了优化侧板加强型节点的抗连续倒塌性能,提出了一种开槽侧板加强型梁柱连接节点形式.通过静力加载试验,得到了新型节点子结构的破坏模式、竖向抗力发展机制、应变分布、延性水平和动力承载力等.试验结果表明:钢梁翼缘在盖板附近首先开裂并向腹板外排螺栓中部延伸贯穿,导致竖向承载力快速下降为峰值荷载的20%左右.相比传统侧板加强型和圆弧扩盖板型梁柱节点,新型节点的峰值承载力分别提高了 62.1%和19.6%,塑性弦转角分别提高了 203.6%和25.8%.通过有限元分析得到了试件的断裂路径发展过程,进一步地通过参数化分析发现:扩大过焊孔构造对改善峰值后塑性弦转角及残余强度提升无明显作用;随着螺栓群远离钢梁翼缘起始断裂位置,最小残余强度比不断增大,但峰值后塑性弦转角呈先增大后减小的趋势;当螺栓群内移45mm时,峰值后塑性弦转角及最小残余强度比分别达到0.149rad和0.88,提高了 38.2%和200.8%.

Abstract

In order to optimize the progressive collapse resistance performance of side plate reinforced connection joint,the beam-column joint with grooved side plate reinforced connection(GSPCP connection)was proposed.Through the static loading test,the failure mode,vertical resistance development mechanism,strain distribution,ductility level and dynamic bearing capacity of the new joint substructure with GSPCP connection were obtained.The test results show that the steel beam flange first cracks near the cover plate and extends through the middle of the outer bolt of the web,resulting in the rapid decrease of the vertical bearing capacity to about 20%of the peak load.Compared with the traditional side plate reinforced connection and the side plate connection reinforced with arc expanded cover plate,the peak bearing capacity of the new joint is increased by 62.1%and 19.6%respectively,and the plastic chord rotation is increased by 203.6%and 25.8%respectively.The development of fracture path of the substructure was obtained by finite element analysis.Through parametric analysis,it was found that expanding the through hole of welding has no obvious effect on improving the post-peak plastic chord rotation and residual strength ratio.With the bolt group away from the initial fracture position of the steel beam flange,the residual strength ratio increase,but the post-peak plastic chord rotation increase first and then decrease.When the bolt group move 45mm inward,the post-peak plastic chord rotation and residual strength ratio reached 0.149 rad and 0.88,which increased by 38.2%and 200.8%respectively.

关键词

钢管混凝土组合柱/梁柱节点/抗连续倒塌性能/延性评估/参数化分析

Key words

composite column of concrete-filled steel tube/beam-column joint/progressive collapse resistance performance/ductility assessment/parametric analysis

引用本文复制引用

基金项目

国家自然科学基金项目(52008270)

国家自然科学基金项目(52308185)

河北省省级科技计划资助项目(22375409D)

河北省高等学校科学技术研究项目(ZD2022040)

石家庄市驻冀高校基础研究项目(241790587A)

出版年

2024
建筑结构
中国建筑设计研究院 亚太建设科技信息研究院 中国土木工程学会

建筑结构

CSTPCD北大核心
影响因子:0.723
ISSN:1002-848X
参考文献量4